Back
Tools for investor
See a list of available sites
Industrial site in the Surgutsky District, 32 ha

Property ID: 0/10/86/25

General
Facility Name
Industrial site in the Surgutsky District, 32 ha
Location
Located on the right bank of the Ob river, alongside the Barsovo village – Tovarny Park road, adjacent to land plot with cadastral number 86:03:0053301:3613, coordinates 61.2468 73.1212
Type
Greenfield
Ownership (Private, Public, Public Private)
-
Management Company/Owner
-
Contact Person
Khanty-Mansiysk Autonomous District (Yugra) Development Fund, Project Maintenance and Management Department Director Stakina Olesya Valerievna
Contacts (Phone, E-mail)
Mobile 8 3467 388 618
Sale/Lease information
-
Industry specialization
-
Transport Accessibility
Distance to the nearest city (km)
16 km to Surgut via the road to the ring-road
Highway linkage
The site is located near the country road with permanent surface, 6 km (by road) away from Surgut – Nefteyugansk highway
Rail service: spur Yes or No
1.The site is located 6 km away from the railway network (SRZHD, territorial administration, Surgutsky District) 2. Sorting station of SMPPZHT, OJSC is located 6 km away (by road)
Railways available at Investment Site
-
Commercial Airport/distance
-
River port/distance
-
Land Plot
Total area (ha)
32
Available area (ha)
-
Zoning Classification (category, permitted use class)
Classification pending (pending the approval of land use and development rules)
Plot Survey (Yes/No)
-
Selling price per ha (RUB)
-
Leasing price per ha (RUB/year)
-
Land tax per ha (RUB/yearly)
-
Industrial Assets
Industrial and warehouse facilities (total area)
none
Industrial and warehouse facilities (available area), sq m
-
Leasing price per sq m (RUB/monthly, VAT-free)
-
Selling price per sq m (RUB, VAT-free)
-
Property tax (%)
-
Office Assets
Office assets (total area), sq m
none
Office assets (available area), sq m
-
Leasing price per sq m (RUB/monthly, VAT-free)
-
Selling price per sq m (RUB, VAT-free)
-
Electricity
Electric power (MW•h)
Tyumenenergo, JSC: 14 MW power capacity. Construction of 6kW power line from main substation 110/6 kW BTRP-6/0.4 kW is required. FGC UES, PJSC can provide a connection to 220/110 kW substation on an individual project basis, including power lines and 35-750 kW substations.
Available electric power (MW•h)
-
Grid connection price (RUB/kW, VAT-free)
-
Electricity price (RUB/kW•h, VAT-free)
-
Gas Supply
Gas supply capacity (cubic meter/h)
Networks of RN-Yuganskneftegaz, LLC. Low pressure gas pipeline, diameter 720 x 8 mm, transporting unprocessed associated petroleum gas to the Surgut Gas Processing Plant, located 5.7 km straight away from the project site.
Available gas supply capacity
-
Gas supply line connection price (RUB, VAT-free)
-
Water Supply
Water supply capacity (m³/h)
Well field Fedorovsky is located 2.5 km away. Water drainage: septic tank, dump wells.
Available water supply capacity (m³/h)
-
Water supply price (RUB/m³,VAT-free)
-
Water supply/sewage connection price (RUB, VAT-free)
-
Manpower Availability
Nearest localities/ distance
16 km to Surgut via the road to the ring-road
Total civilian labour force within a 50km radius (thous. pers.)
-
Unemployed working-age labour force (thous. pers.)
-
Universities per locality (units)
-
Vocational schools per locality (units)
-
Social Infrastructure
Housing for personnel (Yes/No, distance)
-
Hotels for accommodating personnel (Yes/No, distance)
-
Conference hall, business areas (Yes/No)
-
Sport facilities (Yes/No)
-
Canteens and cafes within the territory (Yes/No)
-
Management Company's Services (if any)
Turn-key construction / Project office (EPCM service to provide Technical Customer's functions)
-
Logistics
-
HR recruitment
-
Servicing/Engineering
-
Site security
-
Legal services
-
Consulting services
-
IT services
-
Site cleaning; Garbage disposal
-
Residents' personnel transportation/ personal transport provision
-
Personnel accommodation services
-
Other services (Description)
-
Investment Site Residents
Residents (Planned)
-
Residents (Actual)
-
Export to PDF