Industrial site in the Surgutsky District, 100 ha

Property ID: 0/10/86/24

General
Facility Name
Industrial site in the Surgutsky District, 100 ha
Location
Located on the left bank of the Ob river, near Yugorsky bridge, coordinates 61.2039 73.1293, in cadastral block 86:03:0053401
Type
Greenfield
Ownership (Private, Public, Public Private)
-
Management Company/Owner
-
Contact Person
Khanty-Mansiysk Autonomous District (Yugra) Development Fund, Project Maintenance and Management Department Director Stakina Olesya Valerievna
Contacts (Phone, E-mail)
Mobile 8 3467 388 618
Sale/Lease information
-
Industry specialization
-
Transport Accessibility
Distance to the nearest city (km)
14 km to Surgut vita the road to the ring-road
Highway linkage
The site is located immediately adjacent to the Surgut-Nefteyugansk highway with permanent surface
Rail service: spur Yes or No
The site is located near the railway network (SRZHD, territorial administration, Surgutsky District)
Railways available at Investment Site
-
Commercial Airport/distance
-
River port/distance
-
Land Plot
Total area (ha)
100
Available area (ha)
100
Zoning Classification (category, permitted use class)
Classification pending (pending the approval of land use and development rules)
Plot Survey (Yes/No)
-
Selling price per ha (RUB)
-
Leasing price per ha (RUB/year)
-
Land tax per ha (RUB/yearly)
-
Industrial Assets
Industrial and warehouse facilities (total area)
-
Industrial and warehouse facilities (available area), sq m
-
Leasing price per sq m (RUB/monthly, VAT-free)
-
Selling price per sq m (RUB, VAT-free)
-
Property tax (%)
-
Office Assets
Office assets (total area), sq m
-
Office assets (available area), sq m
-
Leasing price per sq m (RUB/monthly, VAT-free)
-
Selling price per sq m (RUB, VAT-free)
-
Electricity
Electric power (MW•h)
RN-Yuganskneftegaz, LLC power supply networks: can provide 6 kW connection from reserve cells No. 9, 19 substation-35/6 kW No. 111, maximum power no more than 1.5 MW FGC UES, PJSC: can provide a connection to the 220/110 kW sub-station under construction powered from existing 220 kW power line, on an individual project basis.
Available electric power (MW•h)
-
Grid connection price (RUB/kW, VAT-free)
-
Electricity price (RUB/kW•h, VAT-free)
-
Gas Supply
Gas supply capacity (cubic meter/h)
Networks of RN-Yuganskneftegaz, LLC. Low pressure gas pipeline, diameter 720 x 8 mm, transporting unprocessed associated petroleum gas to the Surgut Gas Processing Plant, located 15.7 km straight away from the project site.
Available gas supply capacity
-
Gas supply line connection price (RUB, VAT-free)
-
Water Supply
Water supply capacity (m³/h)
Water supply: nearest water supply source is 7 km away in Barsovo town (across the bridge). Water treatment station capacity -671 cbm/day. Water drainage: septic tank, dump wells.
Available water supply capacity (m³/h)
-
Water supply price (RUB/m³,VAT-free)
-
Water supply/sewage connection price (RUB, VAT-free)
-
Manpower Availability
Nearest localities/ distance
14 km to Surgut via the road to the ring-road
Total civilian labour force within a 50km radius (thous. pers.)
-
Unemployed working-age labour force (thous. pers.)
-
Universities per locality (units)
-
Vocational schools per locality (units)
-
Social Infrastructure
Housing for personnel (Yes/No, distance)
-
Hotels for accommodating personnel (Yes/No, distance)
-
Conference hall, business areas (Yes/No)
-
Sport facilities (Yes/No)
-
Canteens and cafes within the territory (Yes/No)
-
Management Company's Services (if any)
Turn-key construction / Project office (EPCM service to provide Technical Customer's functions)
-
Logistics
-
HR recruitment
-
Servicing/Engineering
-
Site security
-
Legal services
-
Consulting services
-
IT services
-
Site cleaning; Garbage disposal
-
Residents' personnel transportation/ personal transport provision
-
Personnel accommodation services
-
Other services (Description)
-
Investment Site Residents
Residents (Planned)
-
Residents (Actual)
-
Export to PDF