Construction of greenhouse complex stage one

Project at-a-glance

Project highlights
Project indicators
Investment target and overview
Construction of the first stage of greenhouse complex with overall area of 10.5 ha for all-season production of vegetables in the quantity of 6,632.89 tonnes
Total required investment, USD mln
21.3
Investor's equity capital
1.3 (already invested)
Investor's debt capital (by sources)
20
Budgetary funds (guarantees)
Interest rate subsidy 1.2 mln per year
Preferred investment structure
Funds and equipment
Use of proceds
New construction
Yes
Renovation/upgrade of existing assets
No
Project design
No
Preferred investment structure
Information about co-investors (names, investment share):
Confirmed
No
Potential
No
Ratio if equity in total capital, %
Up to 20%
Project status. Available documents (yes/no)
Business idea
Yes
Preliminary research
Yes
Project feasibility study
Yes
Market research
Yes
Project design documentation
Yes
Financial model
Yes
Business plan
Yes
Project launch and closure, years
2016 - 2026
Official materials in support of the projects (decrees of either the federal or regional government, letters from local government, provision of incentives, etc.)
Letters, status of Republic of Adygeya priority project
Key economic indicators
IRR (internal rate if return), %
22.4%
Payback period, years
5.2
NPV (net present value), USD mln
6.943
Implementation status. Information
on available facilities/equipment
Electric networks, specifications for gas supply, the license for water supply, the vertical planning of the construction platform
Comments

** Implementation status. Information on available facilities/equipment:

  1. Power supply
    JSC Kubanenergo – Adygeya Electric Network Branch issued Engineering Specifications No. 02-133-12 of 25 December 2012 for 500kV capacity of power receivers to be connected.
    Overhead power line VL-10kV Hk-1 feeding power to the project site has been designed, built and commissioned.
  2. Gas supply
    Ministry of Economic Development of the Russian Federation allowed and JSC Gazprom approved the use of natural gas in the quantity of 12.38 thsd. TCE per year, starting in 2014, for boiler house and 6 MW mini-cogeneration plant. Engineering Specifications No. 86 of 20 April 2012 have been issued for the construction of a high-pressure gas pipeline; design documentation has been developed.
    Gas distribution station of Khatukay village has been included in JSC Gazprom’s reconstruction plan intended to increase performance to accommodate future consumers of the upcoming greenhouse complex stages.
  3. Water supply
    On 11 June 2013, Subsurface Management Department in the Republic of Adygeya issued License No. 00459 for exploration and extraction of underground drinking water required to satisfy process water demand of agricultural assets until year 2038. Approved documentation for construction of water intake facilities is available.
  4. Roads
    Grading and leveling of the construction site has been completed, including construction of onsite gravel roads.
Export to PDF

Project ID02/23/15

Region of Russian Federation, Area
Krasnodar region
Sector
Fishing and Farming
Parent company/shareholder
LLC Ug-Agro
Legal address of the shareholder, website

Krasnodar, Stasova St. 165

Position, full name of the CEO
of the shareholder
Sergey Viktorovich Fedorko
Contact person, telephone number
Ekaterina Aleksandrovna Ivannikova
Last update
06.02.2015